Gypsum Powder Production Line Engineering Natural Gas Coal as Fuel

Gypsum Powder Production Line Engineering Natural Gas Coal as Fuel

What can we do for our consumers?
For clients with certain necessity, we could give the appropriate solutions or make your programs far more workable dependent on our overseas expertise.
   
For  customers CZPT comprehensive requirement, we would like to suggest our comparable projects according to the local climate and use of the building site.
   
For the worth extra service, we are capable of providing a impression picture to existing the manufacturing line immediately.

Introduction of gypsum powder production line China top company:
As professional manufacturer and supplier for building materials generation strains, we DCI provide gypsum powder production traces, with different capacities in accordance to client’s specifications.
With our professional technological staff, we can complete a series of perform from design and style(mechanical and electrical), manufacture, supply, installation, commissioning to stabilized generation,surely we also supply the spare part supply support.
Till now, we’ve produced and supplied comprehensive sets of machine lines to Russia, Oman, Uzbekistan,United Arab Emirates, Iran.

  1. Transient introduction:

Right after currently being heated and calcined with specific temperature, normal di-hydrate gypsum is dehydrated    
 and decompounded, to get the item whose main ingredient is semi-hydrated gypsum (CaSO41/2 H2O), that is, calcined gypsum (normally slaked gypsum). According to different temperatures and force circumstances throughout dehydration decomposition, the acquired item is β-type calcined gypsum. Standard process of mechanized manufacturing contains five large systems: gypsum grinding technique, automatic measuring system, calcination method, warmth provide method, and getting older& packing program. In accordance to the client’s need, gypsum crushing technique can be included to crush big gypsum rock to be with size of -30 mm, and then conveyed into grinding method.
 
two.Creation line kind
one)Managing component:  Total Automatic
2)Yearly ability: twenty,000 t~three hundred,000t
3) Gasoline: All-natural gas, coal, diesel, hefty oil
four)Raw content: Normal gypsum rock (if incorporating some equipments, industrial by-product–desulfurization gypsum can be utilized), and in conformity with prerequisite of gypsum rock of in excess of Quality three for generating cementing material in JC/T seven hundred-1998: Content of CaSO4·2H2O in uncooked substance >70%.
 
3.Primary Economical and CZPT Paramete

No Identify Unit Index
one Once-a-year capacity MT 30000
two Once-a-year gypsum rock use MT 35000
3 Functioning days/calendar year Working day 300
four Everyday capacity MT a hundred
five CZPTity use for generating one particular ton of gypsum powder
 
KWH 30
six Coal (7000 kcal/kg) Kg/t 33
7 Employee/change people/change six-seven
8 Controlling Element   Full Computerized
9 Yearly capability   twenty, 000-200, 000 Tons For every Calendar year
ten Calcining system   Ebullition furnace
Rotary kiln
Rotary kiln
11 Fuel   All-natural gas, diesel, coal, large oil
12 Uncooked material   Natural Gypsum Rock
13 Finished powder use   Gypsum board
Plaster wall/Putty 

 

4. High quality CZPT:
Gypsum Powder High quality CZPT: GB/T 9776-2008
Gypsum Powder: 80-100mesh
Composition: Content of β-CaSO4·1/2HtwoO (mass portion) in calcined gypsum should be not significantly less than seventy five%.
The Initial Placing Time: Shall Not Be Less Than 6 Minutes,
The Ultimate Setting Time: Shall Not Be Far more Than 30 Minutes

2. Principal Technology
Gypsum Powder Plant(Mother nature Gypsum Rock)
Gypsum Mine –210mm gypsum rock→ Crushing →bucket elevator →silo → Raymond mill →screw conveyor → bucket  elevator →material stablization silo →electronic belt scale →bucket elevator →boiling kiln →bucket elevator →FU chain conveyor →clinker silo →packing
 
5.Main manufacturing tools introduction

  1. Grinding method
  2. Computerized measuring technique
  3. Calcining program
  4. Natural warmth provider boiler
  5. Ageing &packing method
  6. Automatic management method

amid them,the Gypsum powder ebullition furnace used in the calcining program has pursuing advantages:
a Modest volume, huge ability
b Straightforward composition, un-damageable
c Compact framework, less land profession, good de-dusting result
d Less power use
e Convenient to work, simple to control
f Good merchandise quality, fairly best calcined gypsum section composition, secure physical houses
g Reduced funds building investment decision& operation value
 
And the This furnace makes use of electric power or chemical energy produced by reliable, liquid or gaseous fuels as main heat supply and heat conductive oil as heat transfer medium. It adopts pipeline to hook up boiler and thermal equipment into shut system. It also adopts new saving type heating way— adopting compelled circulation to warmth thermal products. In contrast with other heating equipment, it has the pursuing obvious advantages:
a Underneath lower functioning force, it can receive higher heating temperature. As a outcome, gear expense cost is decreased and security element is intensified.
b Heat uniformly and stably, correctly handle heating temperature to keep away from part heating to heated product, successfully improving item quality.
c The heat conductive oil has no corrosion and scale, so investment for h2o therapy products which is needed for heat transfer medium this sort of as drinking water or steam and pharmaceutical treatment method expense is diminished.
d The freezing position of warmth conductive oil is fairly reduced and can be used in chilly winter. Even if it is solidified, there is no growth and no risk for cracking equipment.
e A single organic and natural heat provider boiler can supply warmth for many end users simultaneously with distinct temperatures. As a result the gear expense for numerous heating equipments for several customers is decreased.
f Compared with steam boiler, natural warmth carrier furnace can help save more than 40% energy, for it adopts liquid transmission to transfer power, and circulated heating, CZPT condensation emission to reduction heat. It is the excellent power-saving and setting-defending merchandise, effortless to operate, secure and reliable.
 

Controlling Component Full Automatic
Once-a-year potential CZPTized (30, 000-300, 000 Tons For every 12 months)
Calcining program Ebullition furnace
Rotary kiln
Fuel All-natural gas, diesel, coal, hefty oil
Raw substance Normal Gypsum Rock
Finished powder use Gypsum board
Plaster wall

1. Quality CZPT:
Gypsum Powder High quality CZPT: GB/T 9776-2008
Gypsum Powder: 80-100mesh
The Initial Location Time: Shall Not Be Less Than six Minutes,
The Final Setting Time: Shall Not Be Much more Than thirty Minutes

two. Primary Technologies
1)Gypsum Powder Plant(Nature Gypsum Rock)
Gypsum Mine – Crushing – Grinding – Calcining – Aging -Finished Goods (CaSO4.one/2H2O)

Welcome enquiry us!

Gypsum Powder Production Line Engineering Natural Gas Coal as Fuel

Tags:

leaf chains

As one of leading leaf chains manufacturers, suppliers and exporters of mechanical products, We offer leaf chains and many other products.

Please contact us for details.

Mail:[email protected]

Manufacturer supplier exporter of leaf chains.

Recent Posts